POF 429 - Controlled Plant Practicum
Course Description
Help with Course Description
POF 429 - Controlled Plant Practicum 5 (0-0-40)
|
Description: |
A controlled practicum shall take place at a power plant that satisfies the minimum kilowatt capacity specified in the Power Engineers Regulations. The controlled practicum shall include a documented competency verification system. The competency verification system for a controlled practicum may include a written project report, line drawings of the plant, itemized task listings, projects/challenges, applicable at specific plant level, and attendance verification.
|
Prerequisite: |
- Complete All of the following:
- Complete the following:
- POF401 - Fourth Class Part A1 (6)
- POF402 - Fourth Class Part A2 (4)
- POF403 - Power Lab Part A1 (1)
- POF406 - Fourth Class Part B1 (6)
- POF407 - Power Lab Part B1 (1)
- POF425 - Technical Communications I (1)
- Must be registered in NWP's Power Engineering Fourth Class program and completed the courses listed above in the previous semester
|
Time: |
6 Weeks, 240 Hours |
Timetable for POF429
Code |
Sec |
Dates |
Instructor |
Room |
Days |
Time |
Cost |
Add to Timetable |
POF429 |
Section VA2 is open for registration.
Limit: 11 | Enroled: 11 | Waitlisted: 0 | Reserved: 11
Section VA2 has no seats available at this time.
VA2 |
Nov 20, 2023 to Jan 12, 2024 Practicum (Practicum Work Experience) |
Darling, Wells |
|
Varies |
Varies |
$847.36 |
|
Latest 10 Course Outlines for POF429
Code |
Section |
Instructor |
Semester |
Download |
POF429 |
VA3 |
Darling W |
Jan-Apr 2023 |
PDF |
POF429 |
VA2 |
Darling W |
Sep-Dec 2023 |
PDF |
POF429 |
VA3 |
Varies |
Jan-Apr 2021 |
PDF |
POF429 |
|
Varies |
Jan-Apr 2018 |
PDF |
POF429 |
|
Varies |
May-June 2018 |
PDF |
POF429 |
|
Varies |
May-June 2015 |
PDF |
POF429 |
|
Varies |
Jan-Apr 2015 |
PDF |
POF429 |
|
Ghazi H |
Jan-Apr 2014 |
PDF |
POF429 |
|
Boutilier B |
Jan-Apr 2013 |
PDF |
POF429 |
|
Boutilier B |
Jan-Apr 2012 |
PDF |
Find more course outlines for POF429 ... |